COMPLETE BATHROOM RENOVATION

This project began with the complete demolition of an outdated bathroom, removing everything down to the studs. We removed the wall between the toilet and vanity areas to enlarge the bathroom and create a more open layout.

The renovation included constructing a custom shower wall, installing a pocket-door frame and tile underlayment, and pouring a custom concrete shower base. We installed carefully selected tile throughout the bathroom, completed the drywall, finishing and painting, and added custom barn-style trim around the pocket door and frame.